AKA Energy Delegation Presents 270MW Solar Project Proposal at Presidency
An investment delegation from AKA Energy accompanied by Gomoa Central MP Kwame Asare Obeng met presidential aides regarding a 270MW solar farm. The proposed clean energy project aims to feed directly into the national grid to stabilize electricity supply in the Central Region. Project sponsors noted that financing arrangements have been secured subject to final statutory power purchase approvals.

In Brief
- •An investment delegation from AKA Energy accompanied by Gomoa Central MP Kwame Asare Obeng met presidential aides regarding a 270MW solar farm.
- •The proposed clean energy project aims to feed directly into the national grid to stabilize electricity supply in the Central Region.
- •Project sponsors noted that financing arrangements have been secured subject to final statutory power purchase approvals.
Why It Matters
Expanding renewable generation capacity reduces reliance on imported fossil fuels and supports Ghana’s energy transition goals.
Key Details
- Capacity
- 270 Megawatts (MW)
- Lead Developer
- AKA Energy
- Facilitator
- Kwame Asare Obeng (A Plus), MP
- Location
- Gomoa Central, Central Region
Context & Background
Ghana has set a target of achieving 10 percent renewable energy in its national energy mix under the Renewable Energy Master Plan.
What To Watch
Review by the Energy Commission and GRIDCo for technical grid integration approval.
Original Reporting & Sources
VNews is an independent briefing product. Original reporting remains credited to the following publishers:
This brief was synthesized automatically using attributed third-party reporting. VNews is a digital news publication produced under the VContent Group brand and operated by Francis Vincent Sunday in Ghana, independent from the publishers cited above. Read our AI Transparency Policy and Editorial & Corrections Policy.